| Today the berm is at 2418
Bienville Blvd. The first walk over is located at Slidell Ct. The south
end of the walk over still needs to be completed and we will have
picture when it is done.
Several property owners are in the planning stages for their own
walk over.
A new cross over pipe line has been installed under the road at
2418 Bienville. It is not being used yet because the dredge is still
getting sand from the "borrowing area" around Bridgeview.


Where the Geo foam will be placed on the south side of the berm
|
on the Slidell walk over looking west

On the Slidell cross over looking east.

|